Construction Projects
Construction and Stormwater
The City of New Haven and IDEM regulate construction projects that disturb one acre or more of land. Storm water runoff form construction sites picks up pollutants like trash, chemicals, oils, and dirt/sediment that can harm our rivers, streams, lakes, and coastal waters. To protect these resources, communities, construction companies, industries, and others, use storm water controls, known as best management practices (BMPs). These BMPs filter out pollutants and/or prevent pollution by controlling them at their source. Refer to the Engineering Department and Planning Department for more information on permitting and City Standards.
- City of New Haven Construction Ordinance
- City of New Haven Standards Manual
- Does Your Construction Site Need a Storm Water Permit? A Developer’s Guide to Storm Water Permitting
Learn more about New Haven’s Storm Water and MS4 Program.
Educational Videos
- Proper Concrete Washout Procedures (For Contractors). INAFSM. Duration: Proper procedures for concrete washout placement, operation, and maintenance.
- Construction BMPs - 1: Site Access and Prep. INAFSM. Duration: Items needed to initially prepare a construction site for access and before the site grading begins.
- Construction BMPs - 2: Stormwater Runoff/Run-on. INAFSM. Duration: Items needed to prepare a construction site for handling stormwater runoff from the site and stormwater run-on coming onto the site.
- Construction BMPs - 3: Surface Stabilization. INAFSM. Duration: Erosion and sediment control practices that can stabilize open, exposed areas on your site. Topics include seeding, mulching, blankets & Mats (TRMs), polymers, riprap slope protection and surface roughening.
- Construction BMPs - 4: Outlet Protection & Grade Stabilization. INAFSM. Duration: .Erosion and sediment control practices that protect outlets and establish stabilized grades. Topics include energy dissipater, chutes, pipe drop structure, and toe wall structure.
- Construction BMPs 5 - Temporary Inlet and Curb Protection. INAFSM. Reviews the types of temporary practices that protect storm water management system inlets.
- Stormwater Quality: Inspection. INFSM. Duration: 7:43. Inspector’s overall responsibilities when they inspect an active construction site for compliance with its stormwater quality runoff permit and / or applicable regulatory requirements.
2025 Street Resurfacing Project
Community Crossings Matching Grant Program (CCMG 2024-01) - Asphalt Resurfacing (67 Street Segments and 99 ADA Ramps)
Bid Opening: June 18, 2024. Contractor: API Construction $2,256,500.00. ADA Ramp construction is scheduled to begin 3/10/25 and milling/asphalt resurfacing beginning late March 2025. Substantial Completion is June 30, 2025.
- Aberdeen Ln: Scots Ln to Highland Terrace Dr
- Amberly Dr: Rolling Meadows Ln to Endpoint
- Archstone Cv: Endpoint to Centerstone Pkwy
- Asbury Ct: Asbury Dr to Endpoint
- Baywood Dr: Kirkmore Dr to Woodmere Dr
- Bedford Dr: Springbrook Dr to Woodmere Dr
- Bensman Ave: Summit St to Endpoint
- Brueggmann Dr: Moeller Rd to Endpoint
- Camden Ln: Chaplin Ln to Ganton Ct
- Cameron Ln: Heine Ct to Minnich Rd
- Carmondy Crossing: Haney Ct to Fenwick Dr
- Castlerock Dr: Edisto Dr to Seiler Rd
- Cedar Valley Dr: Moeller Rd to Glenrock Dr
- Centerstone Pkwy: Endpoint to Erwin Ln
- Cottonwood Dr: Endpoint to Endpoint
- Crossland Ln: Endpoint to Centerstone Pkwy
- Darby Ln: Macgregor Dr E to Lopshire Ln
- Douglas Ln: Heine Ct to Argyll Ct
- Dundee Dr: Killmallie to Berwick Ln
- Dundee Dr: Berwick Ln to Scots Ln
- E Lincoln Highway: Broadway St to Minnich Rd
- Edgerose Dr: Hollendale Dr to Rolling Meadows Ln
- Elk Grove Ct: Valley Creek Run to Endpoint
- Glenrock Dr: Cedar Valley Dr to Whitepine Dr
- Green St: Canal St to Rose Ave
- Heine Ct: Berwick Ln to Cameron Ln
- Hollendale Dr: Wealthwood Dr to Parent Rd
- Jonathon Pl: Rolling Meadows Ln to Endpoint
- Knox Dr: Macgregor Dr E to Lopshire Ln
- Koehlinger Dr: SR 930 E to Park Dr N
- Lopshire Dr: Knox Dr to Darby Ln
- Macpherson Dr: Orkney Ln to Berwick Ln
- Macgregor Dr E: Deveron Dr to Pavement Transition
- Macgregor Dr E: Pavement Transition to Darby Ln
- Melbourne Ct: Endpoint to Melbourne Dr
- Melbourne Dr: Woodmere Dr to Sara Cir
- Middle St: Broadway St to Ann St
- Middle St: Green st to Adams St
- Parent Rd: Hollendale Dr to Landin Rd
- Park Dr N: Park Ave to Park Dr S
- Park Dr S: Park Ave to Koehlinger Dr
- Paul Stemmer Pkwy: Rufus St N to Endpoint
- Pinestone Dr: Carmondy Crossing to Dension Ln
- Presidential Dr: Sara Dr to Bedford Dr
- Professional Park Dr: Daly Rd to Werling Rd
- Richfield Dr: Knox Dr to Minnich Rd
- Rolling Meadows Ln: Shordon Dr to Edgerose Dr
- Royalton Dr: Courtney Dr to Brookmont Dr
- Ruthton Dr: Hollendale Dr to Rolling Meadows Ln
- Shordon Rd: Long Rd to Rolling Meadows Ln
- Springbrook Dr: Sara Dr to Bedford Dr
- Sturm Ave: Cottonwood Dr to SR 930 E
- Tanglewood Dr: Summit St to Rose Ave
- Trafalgar St: Endpoint to Wayne Haven St
- Tyland Blvd N: Tyland Blvd W to Tanglewood Dr
- Tyland Blvd S: Tyland Blvd W to Pavement Transition
- Tyland Blvd W: Tyland Blvd S to Tyland Blvd N
- Tylar Pkwy: Tyland Blvd S to Twillo Run
- Twillo Run: Summit St to Tyland Blvd S
- Twillo Run: Tyland Blvd S to tyland Blvd N
- Valley Creek Dr: Werling Rd to Valley Creek Run
- Valley Creek Run: Valley Creek Dr to Endpoint
- Vista Park Dr: Valley Creek Dr to Endpoint
- Wealthwood Dr: Darwood Grove to Hollendale Dr
- Whitepine Dr: Glenrock Dr to Moeller Rd
- Windbur Pl: Rolling Meadows Ln to Endpoint
Community Crossings Matching Grant Program (CCMG 2024-02) - Asphalt Resurfacing (20 Street segments)
Bid Opening: December 19, 2024 at 10:00am in the City Hall Community Room. Contractor: API Construction at $831,500.00 and Substantial Completion is September 30, 2025. Construction will begin after the CCM 2024-1 project is completed.
- Adams St: Union St to Summit St
- Birchpark Dr: Endpoint to Woodridge Dr
- Blaising St: Union St to Middle St
- Deveron Ct: Deveron Dr to Endpoint
- Deveron Dr: Transition to Orkley Ln
- Killmallie Ln: Dundee Dr to Orkley Ln
- Main St: High St to Ann St
- Mourey St: Lincoln Highway to SR 930
- N Rufus St: Rose Ave to Paul Stemmler Parkway
- Oak St: South St to Center St
- Orkney St: Deveron Dr to E Macgregor Dr
- Park Ave: Mourey St to Lincoln Highway
- Rose Ave: N Rufus St to Henry St
- Shannon Dr: Sara Dr to Bedford Dr
- Straford Dr: Werling Rd to Norland Ln
- Summit St: Twillo Run Dr to Linden Rd
- Tweedwood Dr: Tanglewood Dr to Tanglewood Dr
- Tweedwood Cir: Tweedwood Dr to Endpoint
- Union St: Green St to Blaising St
- West St: Lincoln Highway to Endpoint
2025-26 Current City Projects
- Edgerton Rd Watermain Extension & Booster Station (W. of I-469 to E. of Barthaud Rd) - The work shall include the installation of approximately 14,510 LFT of 12" water main connecting to existing water mains, 715 LFT of 12" water main pipe in casings, 280 LFT of 22" steel casing via jack and bore under existing railroad and SCADA upgrades and new telemetry components at 15 sites. Schedule: beginning April 01, 2024 through Substantial Completion on or before October 2025.
- Minnich Rd Trail from Lincoln Highway to 900' south of SR 930 The work shall include the installation of a 10' asphalt trail including 16 new street lights on the west side of Minnich Rd until it gets to SR 930, crosses on the north side of SR 930 to the east side of Minnich Rd and ends at the north property line of the field just south of Parkview. Along with the previous Lincoln Highway Trail completed in the summer of 2025, will connect downtown New Haven to the New Haven District sports complex. There was a successful bid on 5/1/2025 and API Construction was the lowest responsible and responsive bidder at $823,900.00 which represented 0.17% under the Engineer's Estimate of $825,292.89. Substantial completion is currently scheduled for 5/29/2026.
- Tanglewood Addition Sanitary Sewer Relief Project - The work shall include the replacement or rehabilitation of sanitary sewers in Tanglewood. This project bid open on December 5, 2024 at 10:00am in the City Hall Community Room. Crosby Excavating was the low bidder at $1,527,286.00. Funding for this project will be ARPA. Construction began on 2/12/25 and Substantial Completion is September 13, 2025.
- Sanitary Sewer Replacement & Rehabilitation Project - The work shall include the replacement or rehabilitation of sanitary sewers for nine location throughout the city. There was a successful bid on 6/5/2025 and API Construction was the lowest responsible and responsive bidder at $747,000.00 which represented 1.98% over the Engineer's Estimate of $732,475.00. Substantial completion is currently scheduled for 5/30/2026.
- Line A: Center Street from Mourey to State (18" CIPP)
- Line B: Alley between Garden St & Green St and Lincoln Hwy & Park (12" CIPP)
- Line C: Alley between Garden & Green and Park & Elm (12" CIPP)
- Line D: Schnelker Ct between Elm & SR 930 and Garden & Green (10" CIPP)
- Line E: College Ave between Elm & Alley south (8" PVC)
- Line F: Elm St between College & Garden south of Park (8" PVC)
- Line G: Garden St between Elm St & SR 930
- CCMG 2025-1 Edgerton Rd Full Depth Reclamation from city boundary to Webster Rd (4.44 Lane Miles) - The work shall include the full depth reclamation of the roadway, some widening, and a new right turn lane into Superior Aluminum. There was a successful bid on 5/15/2025 and API Construction was the lowest responsible and responsive bidder at $1,983,300.00 which represented 10.16% under the Engineer's Estimate of $2,207,548.46. Substantial completion is currently scheduled for 6/26/2026.
Future City Projects
South Maplecrest Rd Improvements (INDOT LPA) - Phase I Des#2100599 - Phase I: South Maplecrest Road from approx. 600 feet south of SR930 to Moeller Road. The Improvements will consist of roadway widening to a three-lane section (2 travel lanes with a continuous center two way left turn lane), including the reconstruction of the bridge over the Trier Ditch. This project is being constructed under two separate letting contracts. Phase 1 is expected to let in fiscal year 2028 and Phase 2 in fiscal year 2030. South Maplecrest Road will be designed to provide a three-lane pavement section consisting of a 12' lane in each direction and a 14' wide continuous center two-way-left-tum lane. Design will include Curb and Gutter along South Maplecrest. Drainage will be carried through roadside ditches or enclosed storm system. Signing and pavement marking plans. The design for the replacement of the existing bridge over the Trier Ditch to accommodate the expanded roadway improvement width. Roadway lighting will be designed for the entire length of the project. The funding for both phases is INDOT HSIP 90/10 split with the city. Bid date is scheduled for 10/27/2027.
South Maplecrest Rd Improvements (INDOT LPA) - Phase 2 Des#2300600 & 2101081 - Phase II: South Maplecrest Road from Moeller Road to Seiler Road; The intersection of Moeller Road and South Maplecrest Road will be converted to a roundabout, along with a possibility of converting South Maplecrest Road and Seiler Road intersection to a roundabout intersection. This project will also include the installation of an 8-foot pedestrian trail along the east side of the road (in concept stage). A right turn lane on Moeller to turn north on Maplecrest will be constructed in lieu of a roundabout due to AEP Transmission poles needing relocated will be too expensive. Bid date scheduled for 10/29/2029.
Rose Ave & Linden Rd Intersection Improvement (INDOT LPA) Des#2300608 - A planned new single lane roundabout for traffic calming and safety. This project is scheduled for a FY2028 letting. The funding for this project is HSIP INDOT 90/10 split with the city. Bid date is scheduled for 10/27/2027.